https://www.miningweekly.com

Eldorado calls off threat to shutter Greek development projects as relations thaw

21st September 2017

By: Henry Lazenby

Creamer Media Deputy Editor: North America

     

Font size: - +

VANCOUVER (miningweekly.com) – Canadian gold producer Eldorado Gold reports that icy relations with the leftist Greek government are on the mend, and it has temporarily postponed its threats to mothball development of the Kasandra Mines assets in Halkidiki, Northern Greece.

The Vancouver-based company said on Thursday that it has entered into constructive dialogue with Greece's Ministry of Energy and Environment (MoE) regarding the development of the Skouries and Olympias projects and the Stratoni mine, held by the company's subsidiary, Hellas Gold.

The projects were permitted by the Greek State in 2011, under one single environment impact study.

In the wake of Eldorado threatening to halt further investment at its development projects in Greece last week, the MoE responded swiftly by issuing several long-overdue routine permits for the Olympias project. 

“As a result of these developments we have decided to temporarily postpone our decision to place our assets in Halkidiki on care and maintenance,” stated president and CEO George Burns in a news release.

"We preserve the right to place our assets on care and maintenance and to take prompt legal action to protect the company and its assets in Greece, should our dialogue with the MoE prove unsuccessful. At the same time, we remain confident that the arbitration process initiated last week by the Greek government will be concluded in a timely and efficient manner, for the benefit of all stakeholders."

Greece had issued Eldorado with an official notice of domestic arbitration last week, arguing that the technical study Eldorado had completed for the Madem Lakkos metallurgical plant for treating Olympias and Skouries concentrates in the Stratoni Valley, submitted in December 2014, was deficient and thereby in violation of the transfer contract and the environmental terms of the project.

Eldorado disputes this, saying it is “highly confident” that the subject technical study is robust and consistent with the transfer contract, the business plan and the approved environmental terms of the project.

Edited by Samantha Herbst
Creamer Media Deputy Editor

Comments

Showroom

Showroom image
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 
Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

PGMs and green hydrogen make headlines
PGMs and green hydrogen make headlines
19th April 2024
Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.11 0.148s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: