https://www.miningweekly.com

Eskom in surprise termination of Duvha contract talks

Eskom in surprise termination of Duvha contract talks

Photo by Duane Daws

30th June 2016

By: Terence Creamer

Creamer Media Editor

  

Font size: - +

State-owned electricity utility Eskom reported on Thursday that it had terminated contract negotiations for the rebuild portion of the Duvha Unit 3 boiler recovery project after the “supplier was unable to meet the conditions precedent to enable agreement on the contract”.

Eskom did not name the counterparty, but said negotiations had been terminated on June 27 and that a new commercial process would be initiated for the demolition, engineering, procurement and construction scope of the works.

“[The] process is under way. It is expected that Eskom will go to the market soon,” the utility told Engineering News in response to questions.

The termination announcement came as a surprise, as it was confirmed only days after Eskom indicated that the contract negotiations should be concluded before the end of June in a statement released to dismiss suggestions of irregularities.

It also follows a previous indication that Eskom was aiming to appoint a contractor before the end of March – this, after substantial delays in concluding an insurance process that arose after the unit was shut following a catastrophic explosion on March 30, 2014, caused by “over pressurisation of the boiler furnace”.

However, in a response to questions posed by Engineering News, Eskom asserted that the termination was based “purely on conditions precedent not being met” and had nothing to do with reports of contract irregularities.

It would not be drawn, however, on the outstanding conditions, saying only that it was “not in a position to disclose this information due to market sensitivities”.

Eskom also refused to comment on the implications for the insurance payout, confirming only that “there are deadlines which are being met”.

Suppliers had been appointed for the structural assessments and repairs scope of work and Eskom claimed there should, thus, be no delay to the overall schedule for recovering of the unit.

“Based on the current works schedule no additional delay is foreseen, as the structural assessments and repairs scope is on the critical path. The works are expected to continue for the remainder of 2016.”

The structural assessor was identified as WAH Engineering (DRA), while Bilfinger Steinmüller was named as the structural repairer. The scope of work involved structural assessments for the main, primary and secondary steel structures, as well as necessary repairs to enable safe commencement of demolition work.

The utility indicated previously that it expected Duvha Unit 3 to be fully recovered during its 2019/20 financial year.

Edited by Creamer Media Reporter

Comments

Latest News

Showroom

Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 
Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.114 0.15s - 107pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: