https://www.miningweekly.com

Terramin flags higher output at Algeria zinc/lead mine

23rd October 2018

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – An initial optimisation study into the Tala Hamza zinc/lead project, in Algeria, has flagged a substantial increase in production rates, ASX-listed Terramin Australia said on Tuesday.

Terramin, which owns a 65% interest in the project, reported that the initial optimisation study had identified the potential for an additional eight-million tonnes of indicated resource to be included in production, representing an increase of about 30% of the total Tala Hamza reserve tonnage.

The study also anticipated a production rate increase from 1.32-million tonnes a year to 2-million tonnes a year, with the mine life decreasing to only 19 years, compared with the 21 years predicted in the 2018 definitive feasibility study (DFS).

“The results of initial optimisation study work have been very promising. The opportunity to potentially treat more of the resource, increase throughput and bring forward production into the first ten years of operation can be expected to present significant upside,” said Terramin CEO Richard Taylor.

Compared with the 2018 DFS, pre-production capital requirements under the initial optimisation study have increased from $341.4-million to $360-million.

“The compelling results have encouraged us to expedite optimisation to capture the project’s full potential. Tala Hamza is a world-class deposit that will enter production at a time where the market is feeling the effect of systemic under-investment in new supply,” said Taylor.

 

Edited by Creamer Media Reporter

Comments

Showroom

ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 
Willard
Willard

Rooted in the hearts of South Africans, combining technology and a quest for perfection to bring you a battery of peerless standing. Willard...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.192 0.227s - 106pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: