Victoria secures funding to complete Yukon’s next gold mine

13th March 2019

By: Creamer Media Reporter

     

Font size: - +

TSX-V-listed Victoria Gold has secured the necessary funding to complete the construction of the gold mine that it is building in the Yukon Territory.

The company last month reported a 10% increase in the construction cost of the mine to C$487-million, leaving the company with a C$25-million shortfall.

On Tuesday, Victoria announced that it had secured C$30-million of funding on a bought-deal basis, including flow-through shares. The junior will offer common shares at C$0.44 a share and the flow-through common shares at C$0.53 a share. Should no flow-through common shares be subscribed for, the underwriters will buy the number of common shares to provide the company with gross proceeds of C$30-million.

At the end of February, construction of the mine was 75% complete. The first gold pour is scheduled for September.

Once in production, the openpit deposit will produce about 200 000 oz/y for more than a decade, according to a 2016 feasibility study, and will be the largest gold mine in the Yukon’s history.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The login details you entered is incorrect. Please try and re-enter your username and password. If you continue having problems, please contact us at subscriptions@creamermedia.co.za for assistance.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

R/€ = 20.4215 Change: 0.0145
R/$ = 19.0343 Change: 0.0155
Au 2330.33 $/oz Change: -2.10
Pt 925.50 $/oz Change: 0.00