Arrowsmith hydrogen plant closer to development
PERTH (miningweekly.com) – The Western Australian government has flagged a memorandum of understanding between green hydrogen developer Infinite Green Energy (IGE) and Samsung C&T to develop and build the Arrowsmith hydrogen plant.
Located 30 km south of Dongara, the wind- and solar-powered plant is forecast to produce up to 300 t/d of green hydrogen, or 100 000 t/y for domestic and export markets.
Green hydrogen will be produced using a combination of renewable energy from 65 MW solar and 132 MW wind, displacing 118 000 t of carbon dioxide emissions annually. The project is expected to come online in 2025 and will serve the domestic Western Australian energy and transport markets.
The Arrowsmith Stage II is an expansion that includes the production of up to 42 t/d.
“The government welcomes this exciting development which sees Western Australia progress as a significant producer, exporter and user of this emerging renewable energy source,” Hydrogen Industry Minister Roger Cook said.
“Partnerships like these are vital to the delivery of the 2030 vision under the Western Australian Renewable Hydrogen Strategy and future opportunities that come with it.
“With the crucial need to diversify and decarbonise here and around the world, the government is committed to the renewable hydrogen sector to help reduce emissions to achieve net zero greenhouse emissions,” Cook added.
IGE is aiming to be Australia's first zero carbon commercial hydrogen producer.
IGE is also progressing the Northam MEG HP1, another renewable hydrogen project in development with Samsung C&T.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation