https://www.miningweekly.com
Copper|Gold|Lifting|Maintenance|Operations
Copper|Gold|Lifting|Maintenance|Operations
copper|gold|lifting|maintenance|operations

Cobre Panama to restart after three-month Covid pause

The Cobre Panama plant.

The Cobre Panama plant.

8th July 2020

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Toronto-listed First Quantum has been given the green light to resume normal operations at its Cobre Panama mine, after being ordered to shut the mine in early April, owing to Covid-19 cases.

The copper/gold miner said this week that it would implement a reopening plan, which provided for a phased increase of on-site personnel, while production was ramped up to an 85-million-tonne-a-year throughput rate.

The operation would ramp up to full production by mid-August, First Quantum stated.

There were currently about 800 personnel on site and the mine had not reported any Covid-19 cases since April 30.

“The lifting of the suspension order is testament to the hard work from each and every person on the site, working away from their families over the past weeks,” commented Cobre Panama GM Gordon White.

The company said it would provide an updated 2020 production guidance for Cobre Panama with the second quarter results in late July. The mine's guidance for the year wasto produce between 210 000 t and 235 000 t of copper and between 90 000 oz and 100 000 oz of gold.

Cobre Panama was placed on care and maintenance on April 6.

 

Edited by Creamer Media Reporter

Comments

Showroom

Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 
Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

PGMs and green hydrogen make headlines
PGMs and green hydrogen make headlines
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.172 0.216s - 109pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: