https://www.miningweekly.com
Flow|Gold|PROJECT|Flow
Flow|Gold|PROJECT|Flow
flow-company|gold|project|flow-industry-term

Kinross records 20% margin surge, free cash flow triples

The Tasiast mine

The Tasiast mine

8th May 2024

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Canadian miner Kinross has kicked off the year on a robust note, marking a 20% surge in margins and a remarkable tripling of its free cash flow.

In its  first-quarter report unveiled this Tuesday, Kinross revealed a 20% uptick in margins to $1 088/gold-equivalent ounce (GEO) sold, outpacing the rise in the average realised gold price.

The company posted attributable free cash flow of $145.3-million in the three months ended March.

Net earnings rose to $107-million, or $0.09 a share, and adjusted net earnings jumped to $124.9-million, or $0.10 a share.

“Our portfolio of mines performed well, driven by strong operational performance, disciplined cost management and higher gold prices,” said CEO Paul Rollinson.

With first-quarter production of 527 399 GEOs at an all-in sustaining cost (AISC) of $1 310/GEO, Kinross is on track to meet its yearly guidance of 2.10-million GEOs at an AISC of $1 360/GEO.

Kinross’ three biggest producing mines – Tasiast, Paracatu and La Coipa – delivered 68% of total production.

Tasiast achieved record quarterly throughput as the mine continued its strong performance since the completion of the 24k project, while Paracatu achieved record quarterly throughput and La Coipa continued to deliver high-margin production.

Edited by Creamer Media Reporter

Comments

 

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 May 2024
Magazine round up | 17 May 2024
17th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.127 0.168s - 108pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: