https://www.miningweekly.com

South32’s Hermosa project in the US gets federal boost

26th May 2023

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

Diversified miner South32 says its Hermosa metals project, in Arizona, has been confirmed by the US Federal Permitting Improvement Steering Council (FPISC) as the first mining project to be added to the FAST-41 process.

The US federal government will now create a comprehensive and integrated permitting timetable for the project, which is publicly available, and within 21 days of being added to the FAST-41 dashboard the US Forest Service will have to identify all agencies likely to have any review responsibilities and invite them to participate in the process and to set a deadline for their responses.

Within 60 days of being added to the FAST-41 dashboard, the US Forest Service has to establish a comprehensive permitting timetable, which includes intermediate and final completion dates for all federal environmental reviews and authorisations for full project development.

To qualify for the FAST-41 process, complex critical infrastructure projects must meet rigorous criteria to demonstrate benefit to the nation.

Hermosa is currently the only advanced mine development project in the US that could produce two federally designated critical minerals – manganese and zinc – which are essential minerals for powering the world’s clean energy future.

The current phase of study work for Hermosa’s Clark deposit has confirmed its potential to supply battery-grade manganese to the rapidly forming North American electric vehicle supply chain.

The Clark deposit is currently the only advanced project in the US that has a viable pathway to produce battery-grade manganese for the domestic market from locally sourced ore.

“The inclusion of Hermosa as the first mining project added to the FAST-41 process is an important milestone that recognises the project’s potential to strengthen the domestic supply of critical minerals in the US,” said South32 CEO Graham Kerr.

“The project presents a significant opportunity to sustainably produce commodities critical to a low-carbon future.”

There has been no manganese mining in the US since the 1970s and the US is now 100% reliant on foreign sources of manganese.

South32 Hermosa president Pat Risner said the company was hoping to set a new standard for sustainable mining at Hermosa, strengthening the domestic supply chain of critical minerals, growing the local economy, and improving lives in a community that needs more jobs and investment.

“Becoming a covered FAST-41 project will make the rigorous federal environmental review and permitting process for this project more transparent, predictable, and inclusive for all stakeholders. We are committed to working closely with the US Forest Service, cooperating agencies, Native American tribes, and local stakeholders in Santa Cruz County in Arizona to develop this project in a way that benefits the community, minimises impact on the environment, and creates opportunities across the region.”

A previously completed prefeasibility study (PFS) into the Taylor deposit at Hermosa estimated that it could produce 111 000 t of zinc, 138 000 t of lead and 7.3-million ounces of silver, with the current resource life supporting a mine life of 22 years and a nameplate capacity of 4.3-million tonnes.

The PFS estimated a capital cost of $1.23-billion of direct costs and $470-million of indirect costs to establish the first development option at Hermosa, with the sustaining capital estimated at $40-million a year.

Operating costs have been estimated at $81/t of ore milled.

A final investment decision on the Taylor deposit is due mid-2023.

At Clark, South32 has confirmed the potential to produce battery-grade manganese for the North American electric vehicle supply chain, and the company is collecting bulk samples ahead of pilot plant production of battery-grade manganese from mid-2023.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

John Deere (Pty) Ltd
John Deere (Pty) Ltd

In 1958 John Deere Construction made its first introduction to the industry with their model 64 bulldozer.

VISIT SHOWROOM 
Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.274 0.316s - 152pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: