https://www.miningweekly.com
Construction|Design|Exploration|Gas|Mining|Safety|Technology|Underground|Water
Construction|Design|Exploration|Gas|Mining|Safety|Technology|Underground|Water
construction|design|exploration|gas|mining|safety|technology|underground|water

Alrosa expects Mir mine restoration only after 2024

18th March 2019

By: Creamer Media Reporter

     

Font size: - +

Mine restoration at the Mir diamond mine, which flooded about a year-and-a-half ago, is only expected to start after 2024, Russian miner Alrosa reported on Monday, detailing the timelines for the potential restart of the Siberian underground operation.

To decide on the mine’s fate, Alrosa would start on exploration down to 1 300 m to confirm the operation’s reserves. Budgeted to cost two-billion ruble, these activities were scheduled to be completed by early 2022.

Based on the results of the exploration work, pilot holes would be drilled to start preparation of deposit opening design documents and this should be completed by 2024. 

Simultaneously, Alrosa said it would carry out conceptual design activities to ensure water disposal at the mine and choose the best mining technology, as well as ventilation and gas safety options.

If it was decided that the restoration of the Mir underground mine was feasible, the construction would take six to eight years, the company said. 

“The Mir mine restoration can start no earlier than 2024 and only if the studies yield positive results, and if it is confirmed that construction and mining can be done with the highest level of occupational safety,” the company noted.

Production at the Mir underground mine was halted in August 2017 after it was partially flooded.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

Latest News

Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Showroom

Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 
Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.073 0.107s - 89pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: